Installation Guides
Getting Started
Welcome to your new Jakob cable railing project. This guide will walk you through the complete installation process of your premium stainless steel cable railing system. Our marine-grade components are designed for straightforward installation while providing decades of performance.
Before You Begin
We've provided two comprehensive resources to ensure your installation goes smoothly:
- Complete Installation PDF Guide – Detailed step-by-step instructions with measurements, specifications, and technical diagrams.
- Installation Video Tutorial – Visual walkthrough of the entire process from initial measurements to final tensioning
What You'll Need
- Standard tools: Drill, 7/16" and 5/16" drill bits, wrenches, level
- The included professional cable cutter
- Measuring tape
- Safety equipment (gloves)
Planning Your Installation
Take time to plan before drilling. Each Jakob kit includes 12 pre-assembled cables designed to be installed with approximately 3" spacing between cables for code compliance. Remember that proper post construction is critical – posts must be securely anchored to support the tension of the cables.
Expert Tips
- Drill all holes before running any cables
- Install all cables before final tensioning
- Tension cables in sequence (middle cables first, then work outward)
- Allow 24-48 hours for initial stretching before final tensioning
For additional support, contact our technical team at infous@jakob.com
Download the PDF guide and watch our installation video below to begin your project with confidence.